                              滾絲機床運輸過程中,應當向前搬動驅動手柄,使得機頭,距離鉗口越近越好。并用繩索和鉗口牢牢鎖住,防止來回竄動。
                              1. During the transportation of the thread rolling machine, the driving handle should be moved forward to make the head as close as possible to the jaw. And firmly lock with rope and jaw to prevent back and forth movement.
                              2、用叉車裝卸時,應特別注意設備重心。本設備重心偏上,不得有大于10度的傾斜角度,否則有可能會發生側翻事故。
                              2. Pay special attention to the center of gravity when loading and unloading with forklift. The center of gravity of the equipment should not be inclined more than 10 degrees, otherwise rollover accident may occur.
                              3、在施工現場移動設備時,盡可能使用吊裝鼻進行吊裝。
                              3. When moving the equipment on the construction site, the lifting nose should be used as much as possible.
                              二、機床安裝
                              2、 Machine tool installation
                              1、滾絲機床運輸到工作現場,應將設備調整至水平狀態,并將4個行走輪牢靠固定。
                              1. When the thread rolling machine is transported to the work site, the equipment shall be adjusted to the horizontal state, and the four walking wheels shall be firmly fixed.
                              2、滾絲機床的周圍工作區域,如有條件盡可能將其中周圍地面硬化。
                              2. The working area around the thread rolling machine tool, if possible, harden the surrounding ground as much as possible.
                              3、電源為380V交流電,導線必須大于國標2.5平方以上。嚴禁使用小于2.5平方和非標電源線。
                              3. The power supply is 380V AC, and the conductor must be more than 2.5 square meters of the national standard. It is strictly forbidden to use non-standard power lines less than 2.5 square sum.
                              4、接通電源前要嚴格測量電源電壓,電壓過高或過低都會造成,燒毀設備電器元件的可能。
                              4. Before switching on the power sutuijian:www.zhilidajuyuan.com www.1997tc.cn www.shoufeidaomoju.cn
                              www.miaochuangw.cn www.fzqmoju.com.cn www.moju98.com www.bswy1688.compply, the power supply voltage should be measured strictly. If the voltage is too high or too low, it may burn down the electrical components of the equipment.
                              特別注意:上一級電源應有漏電保護閘刀,設備使用前必須要牢靠接地。
                              Special attention: the upper power supply should be equipped with leakage protection switch, and the equipment must be grounded firmly before use.